H1 Plan period and housing targets Start of Plan period End of Plan period Total housing required Source of plan target
H1 01/04/11 31/03/2026 15,000 Emerging Core Strategy

 
  Housing Trajectory: H2  
    04/05 05/06 06/07 07/08 08/09 09/10

Rep

10/11

Cur

11/12

1

12/13

2

H2(a):  Net additional dwellings 628 932 1105 1641 776        
H2(b): Net additional dwellings for the current year           487      
H2(c) projected net additional dwellings up to the end of the relevant development plan document period i. Net additions             400 400 450
ii. Area                  
iii. Target               1000 1000
H2(d): Managed delivery target                  
 
   Housing Trajectory: H2
 

 

13/14

3

14/15

4

15/16

5

16/17 17/18 18/19 19/20 20/21 21/22
H2(a):  Net additional dwellings                  
H2(b): Net additional dwellings for the current year                  
H2(c) projected net additional dwellings up to the end of the relevant development plan document period i. Net additions 500 650 900 1050 1250 1300 1350 1370 1300
ii. Area                  
iii. Target 1000 1000 1000            
H2(d): Managed delivery target                  

 

 

   Housing Trajectory: H2
 

 

22/23

 

23/24

 

24/25

 

25/26
H2(a):  Net additional dwellings        
H2(b): Net additional dwellings for the current year        
H2(c) projected net additional dwellings up to the end of the relevant development plan document period i. Net additions 1200 1100 1090 1090
ii. Area        
iii. Target        
H2(d): Managed delivery target        
 
Housing Trajectory showing: H2
H2 (a):  Net additional dwellings since the start of the Plan (based on H1) 5082
H2 (b): Net additional dwellings for the current year 487
H2 (c): Projected net additional dwellings up to the end of the relevant development plan document period i) 15,400 Net additions
  ii) Area
  iii) Target 15,000
H2 (d): Managed delivery target

 





 
    Total
H3: New and converted dwellings on PDL gross 471
  % gross on PDL 91%
 
  Permanent Transit Total
H4: Net additional pitches (Gypsy and Traveller) 0 0 0
 
  Social rent homes provided Intermediate homes provided Affordable home total
H5: Gross affordable housing completions 27 15 42

3.7 42 affordable homes were delivered during the year. Of these, 27 were for social rent and 15 were shared equity/shared ownership.

 
  Number of sites with a Building for life assessment of 16 or more Number of dwellings on those sites % of dwellings of 16 or more Number of sites with a Building for life assessment of 14 to 15 Number of dwellings on those sites % of dwellings of 14 to 15 Number of sites with a Building for life assessment of 10 to 14
H6 Nil Nil Nil Nil Nil Nil Nil
 
  Number of dwellings on those sites % of dwellings of 10 to 14 Number of sites with a Building for Life assessment of less than 10 Number of dwellings on those sites % of dwellings of less than 10 Total number of housing sites (or phases of housing sites) Number of dwellings on those sites
H6 Nil Nil Nil Nil Nil Nil Nil

 

3.8 Affordable housing policy is being implemented on relevant planning applications and a Supplementary Planning Document has been prepared which includes a target of completing 106 affordable homes per year. There have been 42 affordable homes completed since April 2009.

3.9 The housing trajectory tables illustrate the housing position in Wigan at April 2010 based on the Emerging Core Strategy housing figures. Information on brownfield development is also  given in H3. A total of 471 new and converted dwellings were secured on previously developed land, some, 91% of all dwellings built .

3.10 The housing requirements for Wigan Borough were determined regionally as part of RSS for the North West. As the government has announced that it intends to abolish RSS and that housing targets will be determined locally, a figure of 1,000 dwellings per year has been used as the current target based on our emerging Core strategy.

3.11 In relation to core indicator H2a over the past five years a total of 5082 net additional dwellings were provided in the borough, equating to an annual average of 1016 each year over this period.

3.12 In the present AMR reporting year (2009/10) 487 net dwellings were built. In the year 2008/09 this figure was 776 dwellings. The relatively high rates of development recorded for residential purposes in 2007/08 have not continued into this monitoring period, net housing starts having dropped to represent 30% of the 2007/08 figure. 

3.13 There were no new Gypsy and Traveller permanent or temporary sites created in the  reporting year.

3.14 No dwellings have been recorded in the current reporting year against the Building for Life criteria. However, an Officer has recently completed training as an accredited Building for Life Assessor. It is therefore anticipated that a steadily increasing number of dwellings will be assessed and will feature in future reporting years. 

3.15 The housing position in the Borough will continue to be monitored on a regular basis. Work is continuing on the Council's Strategic Housing Land Availability Assessment (SHLAA) to identify potential sites for housing and to assess when they are likely to be developed, so as to maintain a continuous rolling 5 year supply of sites.